Subscribe:

Ads 468x60px

Labels

Monday, January 17, 2011

Metallurgical Manager

1_campbell-sizanani.jpg Vacancy posted by: Campbell Sizanani Consulting

You must be logged in to apply for this position.
Log in using the form on the right, at the top of the page beneath the logo, or click here to register.

Metallurgical Engineer
Senior Metallurgical Engineer required for $600million project.
Cobalt SX experience - leaching the Cobalt at atmospheric pressure using a new flow sheet which has been fully tested from pilot scale through to large batch testing. Six months in Perth, Australia then Cameroon during the
construction phase.
Pilot and batch testing has been overseen by three world renowned hydrometallurgists.

Brief description of the flow sheet:
Physical Upgrade (PUG) Circuit
ROM Ore Crushing and Storage
Attritioning and Classification Circuit
Grinding Circuit
Leach Circuit
Primary Purification
Counter Current Decantation
Tailings Processing
Leach Area Scrubber
Secondary Purification
Mixed Sulphide Recovery
Tertiary Purification
Sulphide Area Scrubber
Manganese Carbonate Precipitation 1
Manganese Carbonate Precipitation 2
Glauber Salt Recovery Flow
Pyrite leaching at atmospheric pressure which is new, it has never been done before, however, the secondary leach etc, are all old technology, the Mixed Sulphate Precipitate has unusual characteristics as it is a higher than normal % of Cobalt.

Negotiable (12000 - 17000 US$)You must be logged in to apply for this position. Log in using the form on the right, at the top of the page beneath the logo, or click here to register.

Click here to join now

View the original article here

0 comments:

Post a Comment